Foster Hangar Progress Update February 2016

02.08.16- Website Picture

We have finished sheeting the exterior walls and roof of the building, and are now installing the trim, gutters, and downspouts. Other current work includes installing the large exhaust fans and ductwork, new sprinkler system, Air Compressor, Water Evaporator and Sump Pump Systems. In roughly a week, the large exterior louvers will be getting installed on the North Face of the building (above the existing roof). The last item that will be going in is the hanger door. Please check back next month for updated progress photos!